Abstract
The Line Balancing is regarded as one of the most important subjects of industrial institutions because of its obvious effect on the streamline of materials, workers and products. In the current time, many of production problems have appeared in different factories, in general and in the factories of ready-made wears, in particular. One of the most important problems which affects directly on production increase in the Balancing production lines, which will in turn lead to decrease the spoilage, reducs the time of production to the construction of required workman power, if it is invested well and followed by modern scientific methods to achieve the true balancing and arrangement of equipment and units and different production partitions. One these methods is live ranked positional weights which is the subject of this paper to reach the idealistic arrangement in application to the factory of Ready Made wears in mosul as considered one of the distinctive factories in manufacturing the ready made wears. So the method of rank positional weight and the application of suggested model is to develop this method in mosul factory in the light of its actuality