College of Administration and Economics / University of Mosul
  • Register
  • Login
  • العربیة

TANMIYAT AL-RAFIDAIN

Notice

As part of Open Journals’ initiatives, we create website for scholarly open access journals. If you are responsible for this journal and would like to know more about how to use the editorial system, please visit our website at https://ejournalplus.com or
send us an email to info@ejournalplus.com

We will contact you soon

  1. Home
  2. Volume 29, Issue 86
  3. Author

Current Issue

By Issue

By Subject

Keyword Index

Author Index

Indexing Databases XML

About Journal

Aims and Scope

Editorial Board

Editorial Staff

Facts and Figures

Publication Ethics

Indexing and Abstracting

Related Links

Peer Review Process

News

Registration in TANMIYAT AL-RAFIDAIN journal (video)

APA 6th referencing style

Submit manuscript to TANMIYAT AL-RAFIDAIN journal (video)

Our Privacy Policy

The Accountancy Processing of Under Construction Projects – Excavations and Survey Expenses 1283 in Petrol Units With The Application on Northern Oil Company

    Sinan Jamil

TANMIYAT AL-RAFIDAIN, 2007, Volume 29, Issue 86, Pages 70-98
10.33899/tanra.2007.161701

  • Show Article
  • Download
  • Cite
  • Statistics
  • Share

Abstract

Abstract

Oil production and extraction passed in general with four major stages, they are; discovery and oil scanning, well digging and renewal, production and finally refining. The time period may for the first stage is however short or may take long time reach to ten years. Thus, the oil company during the first stage got an uncertainty factor of petrol existence relatively. In the final period there were two probabilities, they are the existence of petrol in huge quantities or inexistence (or in an uneconomic way). Therefore, the payments should be delimited in terms of income, capitalistic or successful efforts ways. This should account the oblivion for there were a probability to uncover petrol in scanning and discovering. This account can be blocked in three cases:
1. In abandoning the project in that area.
2. Shifting into other oil productive wells.
3. Selling to other companies.
In each of these above cases there are three policies might be followed by the oil companies. They are no allocation for the under construction projects – payments of discovering (1283) and allocation for each project. So, the current research sought in details of accounting according to the previous cases and the application on the Northern Oil Company.

.
Keywords:
    Accountancy Processing Under Construction Projects
  • PDF (204 K)
  • XML
(2007). The Accountancy Processing of Under Construction Projects – Excavations and Survey Expenses 1283 in Petrol Units With The Application on Northern Oil Company. TANMIYAT AL-RAFIDAIN, 29(86), 70-98. doi: 10.33899/tanra.2007.161701
Sinan Jamil. "The Accountancy Processing of Under Construction Projects – Excavations and Survey Expenses 1283 in Petrol Units With The Application on Northern Oil Company". TANMIYAT AL-RAFIDAIN, 29, 86, 2007, 70-98. doi: 10.33899/tanra.2007.161701
(2007). 'The Accountancy Processing of Under Construction Projects – Excavations and Survey Expenses 1283 in Petrol Units With The Application on Northern Oil Company', TANMIYAT AL-RAFIDAIN, 29(86), pp. 70-98. doi: 10.33899/tanra.2007.161701
The Accountancy Processing of Under Construction Projects – Excavations and Survey Expenses 1283 in Petrol Units With The Application on Northern Oil Company. TANMIYAT AL-RAFIDAIN, 2007; 29(86): 70-98. doi: 10.33899/tanra.2007.161701
  • RIS
  • EndNote
  • BibTeX
  • APA
  • MLA
  • Harvard
  • Vancouver
  • Article View: 412
  • PDF Download: 13,151
  • LinkedIn
  • Twitter
  • Facebook
  • Google
  • Telegram
  • Home
  • Glossary
  • News
  • Aims and Scope
  • Privacy Policy
  • Sitemap

2019 © کلیة الإدارة والاقتصاد / جامعة الموصل

2019 © Administration & Economics College University of Mosul

Powered by eJournalPlus